Method guide · Progress through phases
Roadmapping
Arrange milestones, capabilities, and external conditions over time, then use dependencies to decide where to start.
- People
- 4–30
- Base procedure time
- 90 minutes
- Recording
- Shared record
Purpose: Make a decision; Build working relationships.
English guide
Text acceptance is not approval of this rendered page, its media, or publication.
How this method works
A method for placing milestones towards a destination on a timeline and using dependencies to decide starting order. Use it when a list of measures is merely ordered, external conditions are mixed with the group's own capabilities, or deadlines remain wishes. Participants define completion evidence for the destination and place milestones in three rows: outcomes, required capabilities, and external conditions. They connect items that must finish first to items that start later, showing where progress requires a prerequisite to be met. The result is milestones over time, relationships, uncertain points, and first items with owners. Do not use it for project control promising detailed dates or effort, or where the destination itself has not been agreed.
Phase schedule
Minutes are cumulative from the start of the base plan, not a live timer. Read scaling for any additional time. Phase controls do not advance automatically.
Use the arrow keys, Home or End while these controls have focus. The complete phase schedule remains below, including without JavaScript.
- Define the destination0–10 minutes from the start (10 minutes)
Action: Define. Participation: Everyone.
Recording not separately specified for this phase
- Propose milestones10–30 minutes from the start (20 minutes)
Action: Propose. Participation: Individually.
Individual record
- Build the timeline30–50 minutes from the start (20 minutes)
Action: Build. Participation: Groups of 3–6.
Shared record
- Connect dependencies50–75 minutes from the start (25 minutes)
Action: Connect. Participation: Groups of 3–6.
Shared record
- Choose starting points75–90 minutes from the start (15 minutes)
Action: Choose. Participation: Everyone.
Shared record
Facilitation steps
- For 10 minutes, define the destination and target period in one sentence and write up to 2 pieces of completion evidence.
- For 20 minutes, each person proposes up to 5 necessary milestones and marks cards as outcomes, capabilities, or external conditions.
- For 20 minutes, in groups of 3–6, place cards in the three rows for outcomes, required capabilities, and external conditions in time order.
- For 15 minutes, connect up to 12 pairs where one card must be completed before the next can proceed, and write the reason.
- For 10 minutes, mark cards with unknown prerequisites and lines forming loops as uncertain, and add one missing-prerequisite card.
- For 15 minutes, choose 2 items to start in the earliest period across all groups and write their owners, completion evidence, and review conditions.
If something changes
If
Twelve minutes into timeline placement, 60% or more of all cards are concentrated in the final time band.
Then
Choose one final card, make one card for intermediate evidence observable before it finishes, and place that in an earlier time band.
If
Ten minutes after drawing relationships begins, a group has fewer than 3 lines.
Then
Read backwards from the card nearest the destination, add one capability or condition needed before starting, and connect it.
Preparation
Materials
- One three-row planning sheet per group for outcomes, required capabilities, and external conditions
- Five milestone cards per person, with a completion-evidence field
- Twelve relationship lines per group, with arrows
- Two uncertainty markers per person
- Two first-item slips per group, with an owner field
- One dark-coloured writing implement per person
Room and setup
- One island table per group of 3–6
- One three-row planning surface per group extending from the present to the destination
- One whole-group surface collecting first items and shared prerequisites
Adjust for people and time
Do not use the method with fewer than 4 people, as it is difficult to consider alternative relationships. Divide participant count by 6 and round up for the number of groups, then form groups of 3–6 differing by no more than 1 person. Each group brings 2 first items and 1 shared prerequisite to the whole-group surface, and adjust order only among items with the same owner.
Safety and non-applicable situations
Agree the destination before using this process. Keep external conditions, capabilities, and uncertainty distinct; the roadmap is not a promise of detailed dates or effort.
Manuscript's recorded references
These translate the original manuscript's source and rights claims. They remain separate from any current-page notice below; they do not establish new verification.
- Government Office for Science: Roadmapping
Adaptation under OGL 3.0; changes made
- OGL 3.0
https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/
Current-page licence notice
A Taiwa no Fumen adaptation based on the UK government publication identified below. Any separately stated terms apply to the material they identify.
Changes: timings, instructions, materials and branches have been edited for this site. The English edition translates the Japanese manuscript, not the government text verbatim.
Contains public sector information licensed under the Open Government Licence v3.0.
This notice does not grant blanket rights to third-party works, personal data, organisational logos or trademarks.
This is not an official or government-endorsed method.
See the licence for its no-warranty and other terms.
© Crown copyright 2024
Credits on the checked source page
- Published by: Government Office for Science
- Produced in collaboration with: SAMI Consulting
Source page checked on 2026-10-17: The Futures Toolkit HTML.
Source lineage
Open Government Licence v3.0 · Legal code · Official source policy
This material-specific notice does not itself establish publication clearance. Preserved manuscript references above remain separate from the current page's credits and licence evidence.
Diagram, print, and video language
Original Japanese guide, diagram, and print view. Their labels and print text have not been translated; an English print edition is not provided here.
English video-library navigation. Original Japanese audio, subtitles and transcripts remain labelled Japanese resources. Their translations are separate later work. No remote player is embedded here.
The manual English phase controls are a navigation aid, not a live facilitation timer. Interactive diagram motion remains pending.
Editorial provenance
Japanese source status and logs are provenance only. They do not mean this English text or interface was field-tested. Historical fixed-text acceptance and hold records remain specific to their recorded versions; displaying them neither asserts current acceptance nor resolves source-specific restrictions.